Casey Jr. was one original ride
that wasn't opened to the public (although it appeared so on T.V.) on opening
day. It didn’t start chugging along until July 31, 1955. Casey Jr. was first
conceptualized as a "high speed" ride but because it could result in
jumping the tracks, the idea was nixed.
(Side story: I have known a few cast members in my day,
and I have it on good authority that this actually is a fear for Disney.
Conductors are taught to slow down during the bottom loop as you come around
the curve. )
Instead, Casey Jr. was
engineered as a “B’ ticket ride that would chug along the tracks. The 3 minute
30 second ride didn’t have much to look at in its first year. It wasn’t until
Disney installed the miniature scenes in September 1956 that it could be
described as “scenic”.
If you listen closely as it goes
up the last hill near Cinderella’s castle you can hear Casey hissing “I think I
can” and as he goes down the hill “I knew I could”.
On aboard!
0 comments:
Post a Comment